This weekend, with the help of our friend Mike, we got the bathroom floor tiled and grouted. What we have accomplished on our bathroom:
- mold removed
- new insulation installed
- backer board in place
- new vanity installed
- floor tiled and grouted
What we still need to do:
- reinstall the toilet
- get the shower fixtures in place
- connect the sink drain pipes
- finish the last wall of backer board
- tile the shower
We have a plumber coming this week to help with the toilet installation, since all our handy friends said to get some professional help on that one. Here are some pictures of our progress:
Before: Complete with ugly angels
Micah ready to tackle the mold behind the wall
The moldy wall
Our finished tiling. You can see where the toilet will go.
No comments:
Post a Comment